Sales BOM Implementation
A bill of material (BOM) describes the different components that together
create a product. A BOM for a bicycle, for example, consists of all the parts
that make up the bicycle: the frame, the saddle, wheels, and so on.
Process Flow
When you enter the material number of a bill of materials that is relevant for
sales order processing, the system displays the material that describes the
whole bill of materials as a main item. The individual components are displayed
as lower-level items.
There are two ways to process a bill of materials in Sales. Once you have
entered a bill of material in a sales order, the system runs pricing, inventory
control, and delivery processing at:
- Main item level if the material is assembled, or
- Component level if the material is not assembled
The type of processing used by the system is determined by the
item category group that you enter in the
material master record for relevant materials.
Processing at Main Item Level
If you want the system to carry out pricing, inventory control, and delivery
processing at main item level, enter ERLA in
the Item category group field of the
Sales: sales org. 2 screen in the material master record
of the finished product. This means that the components only function
as text items and are not relevant for delivery. The following graphic shows how
a bill of material is processed at main item level.
Processing at Component Level
If you want the system to carry out pricing, inventory control, and delivery
processing at the component level, enter LUMF
in the Item category group field of the
Sales: sales org. 2 screen in the material master record
of the finished product. In this case, only the components are
relevant for delivery. During processing the system automatically creates a
delivery group. The latest delivery date among all the components becomes the
delivery date for the entire delivery group.
|